Import Guide

How to Import MDF and Plywood from China

The sequence matters more than the paperwork. Decide the specification, the quantity and the term in that order, and the documents follow.

Decide in This Order

Most first orders go wrong at step two, not at the port. The sequence below is the one that survives contact with a mill, a forwarder and a customs broker.

#DecisionWhy it comes here
1Grade and thickness, written as a specificationEverything downstream — price, certificate, packing, HS code — is a consequence of this line. Fix it first.
2Quantity, expressed in cubic metres and in tonnesBoth numbers, because one of them will bind. See the container maths below.
3IncotermDetermines who books freight, who insures and where risk passes. Changing it later re-prices the whole order.
4Documents, including any destination conformity certificateSome certificates must be arranged before production, not after. This is the step that sinks cargo.
5Inspection and payment termsBoth are leverage, and leverage only exists before the container leaves.

Incoterms: What Each One Puts on You

TermWho books freightWho insuresWhere risk passesPractical note
EXWYouYouAt the mill gateLooks cheapest and rarely is. You inherit export clearance and inland haulage in a country where you have no standing.
FOBYouYouWhen goods are on board at the named portThe default for a buyer who has a forwarder. You see the freight cost as a number instead of inside a margin.
CFRSellerYouOn boardFreight is included, insurance is not. Under-insured cargo is a common and quiet mistake.
CIFSellerSeller, minimum coverOn boardConvenient for a first order. The cover is the minimum the term requires, which is not the same as adequate.
DAP / DDPSellerUsually sellerAt destinationOnly workable where the seller can legally act as importer of record. Many cannot, and some will not say so until the cargo is at sea.

The term does not change the goods, only the bill. Whatever you choose, ask for the freight cost as a separate line — a single landed number cannot be checked, and cannot be compared against the next forwarder.

Quantity: Both Numbers, Because One Will Bind

Board is bought in cubic metres and moved in tonnes, and the container has a limit on each. For 18 mm MDF at 750 kg/m³, one cubic metre weighs 750 kg and holds about 18.7 sheets of 1220 × 2440 mm.

 20 ft GP40 ft HQ
Typical internal volume / payload~33 m³ / ~28 t~76 m³ / ~26 t
18 mm MDF, 750 kg/m³volume binds: roughly 28–30 m³, about 22 tweight binds: about 35 m³ of a 76 m³ box

Which means a 40 ft high cube of thick MDF arrives half empty, and there is nothing wrong with the loading — it is at its weight limit. The workaround is a mixed container: thinner board, film faced plywood or edge banding on top of the dense base. Full working on MDF board specifications.

Documents You Should Receive

DocumentWhat it provesWatch for
Commercial invoiceValue, terms and partiesThe seller's legal name must be the one that appears on the bill of lading, or the bank and the broker will both query it.
Packing listBundles, sheets, weights, dimensionsMust reconcile with the invoice in cubic metres and tonnes. Discrepancies surface at destination, when they are expensive.
Bill of ladingTitle and carriageCheck consignee, notify party, port of discharge and the description — a generic description can hold up a claim.
Certificate of originPreferential duty where a trade agreement appliesMust be the right form for the agreement and issued before shipment in most cases.
Fumigation / ISPM 15Wood packaging complianceApplies to the pallets, not the board. Stamped or treated pallets, or the container is refused.
Mill test reportDensity, thickness, internal bond, emission classCheck that the thickness and the date actually cover your order. A report for 12 mm says nothing about 18 mm.
Destination conformity certificateSONCAP for Nigeria, SASO / SABER for Saudi Arabia, ECAS for the UAE, and equivalents elsewhereSome must be applied for before production. Confirm the current requirement for your HS code with a licensed agent early — see certifications by market.

MDF sits in HS 4411, split by thickness: 4411.12 up to 5 mm, 4411.13 above 5 to 9 mm, 4411.14 above 9 mm. Plywood is 4412. Confirm the code with your broker, because the duty rate and the conformity requirement both follow it.

Inspection Before the Container Leaves

Inspection is not a courtesy visit. It is the only moment when a problem is still cheap, because after the container is sealed your options are a claim and a delay.

CheckHow
ThicknessCalliper, several sheets from several bundles, not the top one. Compare against the stated tolerance.
DensityWeigh a sheet and divide by its measured volume. A 17.6 mm board at nominal weight is a density failure, and it is invisible by eye.
Emission and test reportsThe report's thickness, standard number, test method, laboratory and date — all four, matched to this order.
Faces and edgesPatched areas, sanding marks, edge chipping, moisture staining on the outer bundles.
Count and packingSheet count per bundle, strapping, corner protection, moisture barrier, mill marking.
ContainerDry, no holes, no residue, no odour from a previous cargo. Photograph the empty box before loading.
SealNumber recorded and photographed, and matched on the bill of lading.

Photographs should carry a timestamp and show the bundle markings. Without them, a dispute becomes one person's word against another's.

Payment and Risk

Terms in this trade are ordinary and none of them are exotic: a deposit by T/T with the balance against copy documents, or a letter of credit for larger orders. What matters is not which one, but that the sequence keeps the balance tied to something you have seen.

StructureWhen it makes senseThe risk it leaves you
30 / 70 T/T against copy B/LRepeat orders with a mill you have usedYou pay the balance before you have inspected the cargo. Mitigate with pre-shipment inspection.
Letter of creditFirst order, or a value you cannot afford to loseCost and paperwork discipline; a single discrepancy delays payment and therefore the vessel.
100 % before productionOnly where you have independent verification of the millEverything. This is the arrangement that produces the stories people repeat about Chinese suppliers.

One rule is worth more than the table: never release a balance before an inspection you commissioned, on the first order with any mill.

Five Mistakes That Cost the Most

MistakeWhat it costs
Ordering by “18 mm MDF” with no densityA lighter board that machines badly, at a price that looked competitive. The gap is invisible until the first threaded insert pulls out.
Discovering the conformity certificate after productionCargo that cannot clear, storage at destination, and a re-testing bill. Ask before the mill starts.
Filling a 40 ft high cube with thick dense boardRoughly half the freight you paid for. The box is legal; the utilisation is not.
Skipping pre-shipment inspection on a first orderNo evidence, no leverage, and a claim that depends on goodwill.
Accepting a single landed priceYou cannot see the freight, so you cannot compare it, and every future quote is anchored to a number you never verified.

For the port and shipping side of the same journey, see shipping from Qingdao. For what we do between the mill and the container, see how we work.

Questions We Get Asked

Do I need an import licence? That is a destination question, not a Chinese one. Most markets require a registered importer of record for a commercial shipment; some require additional product registration. Your broker or freight forwarder will answer it in one sentence for your country, and it is worth asking before you request a quotation.

How long does a first order take? The honest answer has three parts and none of them is a single number: production scheduling after deposit, transit, and clearance at destination. The third is the one that surprises people, particularly where a conformity certificate is involved. Ask each party for its own estimate rather than accepting a total.

Can you ship less than a container? Yes, as a mixed load with other panel products rather than as loose LCL, which is hard on board. See small orders.

What if the goods do not match the specification? It depends entirely on what the specification said and what evidence exists. This is why the inspection table above matters more than the payment table: an inspection with timestamped photographs turns a disagreement into a documented one.

Who pays the duty? The importer of record, at destination, according to the HS code and the origin. Under DDP the seller agrees to bear it, which is exactly why DDP is harder to arrange than it looks and why some sellers quietly decline it after quoting.

Do you handle the certificate for my market? We coordinate it with the mill and the accredited body and tell you which mill can actually supply which certificate. The certificate itself is issued to the exporter and the mill's test data sits behind it.

Send Your Panel List

Give us the destination market, the thickness and the grade your customer asked for. We come back with the mill options, the certificate each one can supply, and a price per cubic metre.

Send Your Panel ListWhatsApp: +86 152 6584 7535
Chat with us